1.想問大家OP係未=驗樓
2.想問大家驗消防sin定係驗樓sin
3.想大家知吾知咩叫N-3(係未話樓面低3層)
4.我想知道個地盤2個月至半年後的進度.我第一樣要想係D咩



熱賣及精選
1. 不等同, 驗樓係一個程序, OP係個結果
2. 驗消防先
3. 唔知你問乜
4. 想吓自己有無做Programme



提示: 作者被禁止或刪除 內容自動屏蔽
我想問op係咩呢..


[隱藏]
Occupation Permit

呢行太多術語啦!
好似攞DG,入314,入501,攞OP,仲有CC,跟住就係出PC同埋MC。



第4點要做programme喎...想知道2個月至半年後既進度, 要知既係個contract completion date...


引用:
原帖由 PCCWman 於 2009-4-3 11:53 PM 發表

我想問op係咩呢..
入伙紙
即係BA 認同你間premises 可以being occupied



引用:
原帖由 PCCWman 於 2009-4-1 10:45 PM 發表

1.想問大家OP係未=驗樓 - OP will be issued after BD inspection and found satisfactory with your site.
2.想問大家驗消防sin定係驗樓sin - usually FS inspection before BD inspection. BD will only issue OP after they have got a Fire Cert from FSD.
3.想大家知吾知咩叫N-3(係未話樓面低3層)- in my knowledge, it means the progress relation between the slab construction and other trades such as window frame installation/blockwall,drywall erection,etc. For example: when the slab is casted up to 33/F, window frame installation should be up to 30/F.
4.我想知道個地盤2個月至半年後的進度.我第一樣要想係D咩 - Current site progress against Master Program


Hope the above answer in red could help you

[ 本帖最後由 cow2046 於 2009-4-4 10:39 AM 編輯 ]


thank you for you information..........
你係做Cleck of works



[隱藏]
引用:
原帖由 PCCWman 於 2009-4-4 08:34 PM 發表

thank you for you information..........
你係做Cleck of works
used to be
but now...............unemployed

you worked with PCCW?

[ 本帖最後由 cow2046 於 2009-4-4 10:28 PM 編輯 ]



cool...........................................helpful ppl


no ar....i construction work
i have many friend is COW on site
so i ask you